Progress Charts
Work Breakdown Structure
Linear Responsibility Chart
Linear Responsibility Chart | Mentor: Dr. Nitin Agrawal | Co-Mentor: Dr. Padmanabhan Seshaiyer | Nawal Boufrou | Nisha Sharma | Matthew Tolbert | Andre Hop |
1.0 Understand User Requirements | 1 | 1 | 1 | 1 | ||
1.1 Meet mentors | 1 | 1 | 1 | 1 | ||
1.1.1 Clarifying problem statements | 3 | 4 | 1 | 1 | 1 | 1 |
1.1.2 Setting goals and objectives | 3 | 1 | 1 | 2 | 2 | |
1.2 Conduct research | 1 | 1 | 1 | 1 | ||
1.2.1 Obtain device background information | 1 | 1 | 2 | 2 | ||
1.2.2 Learn about applications of the device | 2 | 2 | 1 | 1 | ||
2.0 Mathematical computational and modeling | 3 | 2 | 2 | 1 | 1 | |
2.1 Matlab modeling | 5 | 4 | 2 | 2 | 1 | 1 |
2.1.1 Determine heat equation | 4 | 2 | 2 | 1 | 1 | |
2.1.1.1 Solve one dimensional equation | 4 | 2 | 2 | 1 | 1 | |
2.1.1.2 Solve two dimensional equation | 4 | 2 | 2 | 1 | 1 | |
2.2.1 Flow equation | 4 | 1 | 1 | 2 | 2 | |
2.2.1.1 Solve two dimensional flow equation | 4 | 1 | 1 | 2 | 2 | |
2.2.1.2 Integrate Flow and Heat Equations | 6 | 4 | 1 | 1 | 2 | 2 |
2.2 Comsol Modeling | 4 | 1 | 1 | 2 | 2 | |
2.2.1 Perform two dimensional modeling | 1 | 1 | 2 | 2 | ||
2.2.2 Perform three dimensional modeling | 2 | 2 | 1 | 1 | ||
3.0 Device design | 6 | 1 | 1 | 1 | 1 | |
3.1 Selecting device materials | 1 | 2 | 2 | 2 | ||
3.1.1 Select controller | 3 | 1 | 1 | 2 | 2 | |
3.1.2 Select thermocouple | 3 | 1 | 1 | 2 | 2 | |
3.1.3 Select heating elements | 3 | 2 | 2 | 1 | 1 | |
3.2 Fabrication of the device | 6 | 1 | 1 | 1 | 1 | |
3.2.1 Creating device platform | 3 | 1 | 1 | 2 | 2 | |
3.2.1.1 Integrating heating elements into device platform | 3 | 2 | 2 | 1 | 1 | |
3.2.1.2 Assemble controller and thermocouple | 3 | 2 | 2 | 1 | 1 | |
3.2.1.2.3 Complete device | 6 | 1 | 1 | 1 | 1 | |
4.0 Device testing | 6 | 2 | 1 | 2 | 2 | |
4.1 Testing devices with fluorescent beads and water | 5 | 2 | 1 | 2 | 2 | |
Key: | ||||||
1 = Primary Responsibility | ||||||
2 = Support/ Work | ||||||
3 = Must be consulted | ||||||
4 = May be consulted | ||||||
5 = Review | ||||||
6 = Final Review |
Percent Complex Matrix
Tasks | Planned Duration(days) | Percent of Total | Status(see key) | Credit(days) |
Start Project | 0 | 0% | 2 | 0.0 |
Clarify Problem Statement | 3 | 100% | 2 | 3.0 |
Initial Literature Research | 14 | 100% | 2 | 14.0 |
Mathematical/Computational Modeling | 54 | 30% | 1 | 19.0 |
Functional Prototype | 10 | 0% | 0 | 0.0 |
Present Results | 7 | 0% | 0 | 0.0 |
Ordering Materials | 2 | 0 | ||
Test Materials | 3 | 0% | 0 | 0.0 |
Fabrication of device | 2 | 0% | 0 | |
Test Device | 3 | 0% | 0 | 0.0 |
Reports Results | 3 | 0% | 0 | 0.0 |
End of Project Part1 | 0 | 0% | 0 | 0.0 |
Total Days Budgeted | 101 | |||
Key | 0=Not Started No Credit | 1=in Process ⅓ Credit | 2=Completed Full Credit |
Gantt Chart
Make a Comment